[1]
Guritno, G. and Fhilia, A.D. 2024. Evaluasi Panjang Runway Terhadap Pesawat Rencana A380 di Bandar Udara Internasional Zainuddin Abdul Majid Lombok. SAINSTECH: JURNAL PENELITIAN DAN PENGKAJIAN SAINS DAN TEKNOLOGI. 34, 2 (Aug. 2024), 1–12. DOI:https://doi.org/10.37277/stch.v34i2.2004.