[1]
Kadri, S. and Nawir, M. 2025. Penyebab Cost Overrun Pada Proyek Pengembangan Pos Lintas Batas Negara (PLBN) Terpadu Labang Kabupaten Nunukan Provinsi Kalimantan Utara. SAINSTECH: JURNAL PENELITIAN DAN PENGKAJIAN SAINS DAN TEKNOLOGI. 35, 3 (Sep. 2025), 62–73. DOI:https://doi.org/10.37277/stch.v35i3.2412.