Kadri, Syofian, and Muhammad Nawir. “Penyebab Cost Overrun Pada Proyek Pengembangan Pos Lintas Batas Negara (PLBN) Terpadu Labang Kabupaten Nunukan Provinsi Kalimantan Utara”. SAINSTECH: JURNAL PENELITIAN DAN PENGKAJIAN SAINS DAN TEKNOLOGI 35, no. 3 (September 25, 2025): 62–73. Accessed November 29, 2026. https://journal.istn.ac.id/index.php/sainstech/article/view/2412.